-
Energia test article in MIK RN in Baikonur.
-
Payload bay of orbiter 2K during processing.
-
Orbiter 2K at pad 110/37.
-
Buran on pad 110/37 during the first rollout.
-
Buran on the Antonov An-225 Mriya.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
Buran on pad 110/37 before the launch.
-
Buran on pad 110/37 before the launch.
-
Buran on pad 110/37 before the launch.
-
Buran on pad 110/37 before the launch.
-
Buran on pad 110/37 before the launch.
-
Buran on pad 110/37 before the launch.
-
Buran being loaded onto the mate-demate device in Baikonur.
-
Buran being loaded onto the mate-demate device in Baikonur.
-
Buran on the Antonov An-225 Mriya.
-
Buran being loaded onto the mate-demate device in Baikonur.
-
Buran being loaded onto the mate-demate device in Baikonur.
-
Buran being loaded onto the mate-demate device in Baikonur.
-
Buran on the Antonov An-225 Mriya.
-
Buran being loaded onto the mate-demate device in Baikonur.
-
A Myasishchev VM-T Atlant and payload 2GT at the mate-demate device in Baikonur.
-
Buran on pad 110/37 before the launch.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
Buran after the orbital flight.
-
cFztBnDlJg0
-
Energia-Buran scale model in a wind tunnel.
-
Buran on pad 110/37 before the launch.
-
Buran on the Antonov An-225 Mriya.
-
Buran on the Antonov An-225 Mriya.
-
Buran on the Antonov An-225 Mriya.
-
OK-GLI in the hangar at Zhukovskiy.
-
Buran on pad 110/37 before the launch.
-
Buran on pad 110/37 before the launch.
-
Orbiter 2K during processing in Baikonur.
-
Orbiter 2K during processing in Baikonur.
-
Orbiter 2K during processing in Baikonur.
-
Orbiter 2K during processing in Baikonur.