-
Work on the thermal protection system of orbiter 2K in MIK OK.
-
Work on the thermal protection system of orbiter 2K in MIK OK.
-
1991081243 2
-
1991081243 3
-
Buran orbiter 2K during pad tests on pad 110/37.
-
Work on the thermal protection system of orbiter 2K in MIK OK.
-
Work on the thermal protection system of orbiter 2K in MIK OK.
-
Reinforced Carbon-Carbon wing leading edge panel for orbiter 2K before installation.
-
Buran orbiter 2K in the TPS bay of MIK OK.
-
Payload bay door segments for orbiter 2K before installation.
-
EJis wdUUAA1a5E
-
gub3-16