September 2024
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
November 2024
  • 10521 10521
  • 52 52
  • 54 54
  • Buran being inspected on the pad during the October-November rollout. Buran being inspected on the pad during the October-November rollout.
  • Buran on pad 110/37. Buran on pad 110/37.
  • cabine0 cabine0
  • IMGP0363 IMGP0363
  • IMGP0364 IMGP0364
  • IMGP0366 IMGP0366
  • IMGP0372 IMGP0372
  • rcc panel static test rcc panel static test