-
7
-
9
-
12
-
10
-
4
-
3
-
6
-
Energia and Polyus lifting off from the UKSS.
-
3
-
9
-
11
-
1
-
0
-
8
-
Energia test article 5S on the "grasshopper" transporter-erector on the way to the pad.
-
Buran on pad 110/37 during the first rollout.
-
2
-
7
-
1
-
An Energia test article during pad testing.
-
An Energia test article during pad testing.
-
5
-
Test article OK-MT and Energia 4M stacked at pad 110/37.
-
4
-
An Energia test article during pad testing.
-
An Energia test article during pad testing.
-
Energia test articles during assembly in Baikonur.
-
An Energia test article during pad testing.
-
Test article OK-MT and Energia 4M stacked at pad 110/37.
-
Energia test articles during assembly in Baikonur.
-
An Energia test article during pad testing.
-
060-Chargement Dechargement-Loading Unloading-VMT 02
-
Energia test article in MIK RN in Baikonur.
-
1
-
Energia test articles during assembly in Baikonur.
-
Test article OK-MT and Energia 4M stacked at pad 110/37.
-
Test article OK-MT and Energia 4M stacked at pad 110/37.
-
Orbiter 2K being mated to an Energia rocket.
-
Buran on pad 110/37 before the launch.
-
Energia core stage's RD-0120 engines in Baikonur.
-
Blok Ts intertank being integrated with the oxidizer tank.
-
Buran on pad 110/37 before the launch.
-
An Energia test article and an orbiter during pad testing.
-
Cryogenmash employees at pad 110/37 with Buran.
-
KBOM employees and MoD representatives at the launch complex
-
Buran rolled out to the pad on the TUA transporter-erector.
-
Buran on pad 110/37 before the launch.
-
Buran on pad 110/37 before the launch.
-
Buran being erected at pad 110/37 during the May 1988 rollout.
-
Buran on pad 110/37 before the launch.
-
Buran on pad 110/37 before the launch.
-
Buran at pad 110/37 in October/November 1988.
-
Energia test articles during assembly in Baikonur.
-
Buran on pad 110/37 before the launch.
-
Energia test articles during assembly in Baikonur.
-
Energia test articles during assembly in Baikonur.
-
myavmt2
-
Energia 6SL and Polyus lifting off from Baikonur's UKSS.
-
The engine section of an Energia core stage.
-
The engine section of an Energia core stage without aero covers.
-
Buran on pad 110/37 before the launch.
-
Energia assembly in MIK RN.
-
Four RD-0120 nozzles and the Blok Ya launch table adapter as seen from Energia's flame trench.
-
Buran test article OK-MT and Energia test article 4M being erected at pad 110/37.
-
Energia test articles during assembly in Baikonur.
-
Energia rockets during assembly in MIK RN.
-
Myasishchev VM-T Atlant with cargo 1GT - Energia's hydrogen tank.
-
Energia Blok A booster production line in Baikonur's MIK RN.
-
VM-T Atlant with payload 1GT
-
Orbiter 2K at pad 110/37.
-
Energia Blok A booster production line in MIK RN.
-
Buran orbiter 2K during pad tests on pad 110/37.
-
Energia Blok A booster production line in Baikonur's MIK RN.
-
Energia Blok A booster production line in Baikonur's MIK RN.
-
Energia 6SL and Polyus at Baikonur's UKSS.
-
VM-T Atlant with payload 2GT.
-
Myasishchev VM-T Atlant with cargo 2GT - Energia's oxygen tank and engine section.
-
Energia test articles during assembly in Baikonur.
-
Buran test article OK-MT and Energia test article 4M being erected at pad 110/37.
-
The business end of an Energia core stage.