"The stages of creating and deploying a station are considered in the summary network model of the program, Fig. 16
The launch date for the first module of the station - the power module, is determined by the time frame for the creation and testing of the RLA-120 launch vehicle and is possible no earlier than 1st quarter 1979.
The process of station deployment is carried out by sequentially launching on the OISZ functional modules: residential in 1980, military-geophysical in 1981, laboratory in 1982, geophysical No. 2 in 1983, astrophysical in 1984.
Delivery of crew and cargo to the station is ensured by the sequential deployment, starting from the second quarter of 1980, of transport modules.
The stages of creation and deployment of a permanent orbital station are considered in more detail in the “general schedule for the creation of the POS” in Volume IV.

2.5. Stages and timing of the creation and deployment of the lunar expeditionary complex

The main components of the lunar expeditionary complex are the RLA-150 launch vehicle, spacecraft that ensure the delivery of technical equipment and crew to the lunar surface, and the modules of the lunar complex itself.
The duration of the lunar expedition of the first stage and the deployment of the lunar expeditionary complex is determined by the availability of these components. Possible readiness dates for the RLA-150 launch vehicle are discussed above.
The main factors determining the timing of the creation of the lunar complex are the duration of the creation and testing of the systems and the capabilities of the production and experimental bases.
The process of creating and deploying a lunar expeditionary complex is carried out in stages. At the first stage, starting in 1981 [cont.]"