[ stop the slideshow ]

Buran being inspected on the pad during the October-November rollout.

427/1693
bur pad inspection.jpg Buran being erected at pad 110/37 during the May 1988 rollout.ThumbnailsBuran being loaded onto the An-225 Mriya.Buran being erected at pad 110/37 during the May 1988 rollout.ThumbnailsBuran being loaded onto the An-225 Mriya.Buran being erected at pad 110/37 during the May 1988 rollout.ThumbnailsBuran being loaded onto the An-225 Mriya.

Buran being inspected on the pad during the October-November 1988 rollout.

"Reusable Space System Energia-Buran", OmV Luch, 2004
Processing by The Energia-Buran Archive